Containers FAQ
Wooden Houses FAQ
Swimming Pools FAQ
Steel Houses FAQ
Assembling your new house is included in the offer.
We are using only CE certified materials. Our buildings are precisely designed and done according to the latest construction standards applicable in the country of delivery.
Below is a detailed list of all the things that are included in the price and extra-paid options.
As standard, all buildings from the offer are designed for the snow load 1,00-2,50 kN/m². The construction may have to be adjusted if you live further North.
Our houses are based on a steel frame and PIR insulation. The whole building is split between a few ready modules that are getting connected to each other once arriving at the construction site.
Included in the price
Turn-key standard
We are offering our products in a turn-key standard. Detailed information depends on the model and can be provided upon request.
Construction documentation
Free of charge. You will receive from us drawings (English, Polish or Swedish language) for:
– architectural layout
– construction details
– electrical installation outputs
– water / sewage installation outputs
– external connection to electrical, water, sewage
For an additional fee, we can help you with some of the extra works including:
– project customization (45 EUR net / design hour)
– 3D photo realistic visualizations (price starts at 350 EUR)
External Walls
– Interior wall finished layer
– Plasterboard 2×12.5 mm
– Air gap 25 mm
– Sandwich panels PIR 120 mm (heat tranfer coefficient: from U=0,018 W/m2)
(wooden facade in standard for some of the products, for other optional)
– Wood furring 20×30 mm
– Exterior wall finished layer: standing seam anthracite panels, optional wood facade (raw, painted, stained)
Internal Walls
– Interior wall finished layer
– Plasterboard 12.5 mm
– UW 75 wall-hung profile + 7 cm sound insulation, mineral wool
– Plasterboard 12.5 mm
– Interior wall finished layer
Floor
– Waterproof plywood 44 mm
– Vapor barrier
– Sandwich panels installed to a steel frame, PIR 120 mm
Roof
– Plasterboard 12.5 mm
– Air gap 25 mm
– Sandwich panels installed to a steel frame, PIR 160 mm
– Roof finished layer: standing seam anthracite panels
Gutters
Barn House is equipped in standard with steel hidden anthracite gutters. You don’t see them from the outside.
Above the outside doors and windows we provide a small lintel that prevents water from leaking inside.
Flashings, window sills
Exterior doors
Windows
Stairs
Interior doors
We are providing our objects equipped with 80 x 200 cm high quality honeycomb core interior doors. As standard in a white color.
External lighting
Our houses are equipped with outdoor anthracite LED wall lights.
Electrical installation
Outdoor output is located under the house, therefore the building needs to be carefully placed on the foundations.
Water installation
Sewage installation
Ventilation
We are using only EU certified materials.
Heating
Our houses are equipped with a complete heating and cooling system (if the object is equipped in A/C).
Electric heaters or infrared wall / ceiling panels (low energy consumption)
A/C with warming function located in the living room (if the object is equipped in A/C)
We are using only EU certified materials.
Not included in the price
Foundation
Assembly
There are a lot of dependencies so all the calculations will be prepared individually. We provide that service for free.
It requires a crane (the depends on the distance between the truck and the desired location). The whole assembly usually takes less than a day.
Before the house is transported to you and assembled, certain things must be already finished by you:
– Foundation must be ready. Dry and checked, prepared for the house-construction. We recommend either a concrete slab or a foundation wall.
– Water, electrical and drainage outlets must be done and checked again with the drawings.
– Access to the plot must be provided for a truck and a crane. Min.7m free space diameter for the crane is necessary.
Transport
Payment
Payment for your house is divided into 3 stages secured by a contract:
– 50% reservation fee when signing the contract
– 30% payment after the building is built in our factory
– 20% payment after the building arrives to the Client