We are using only CE certified materials. Our buildings are precisely designed and done according to the latest construction standards applicable in the country of delivery.
Below is a detailed list of all the things that are included in the price and extra-paid options.
As standard, all buildings from the offer are designed for the snow load 1,00-2,50 kN/m². The construction may have to be adjusted if you live further North.
We are using one-trip shipping containers. They are used once before they reach their destination. These boxes have been loaded with cargo one time and have made a single trip.This simple fact is giving you long lifetime security for your new home.
Guaranteed buyback
We offer our Clients buyback of our shipping container houses up till 2 years from the day of delivery. To validate the value of used product we need to inspect it first and consider potential repairs and loss of value. To estimate it correctly, we provide detailed caluclations to our Clients.
Included in the price
Turn-key standard
Construction documentation
Free of charge. You will receive from us drawings (English, Polish or Swedish language) for:
– architectural layout
– construction details
– electrical installation outputs
– water / sewage installation outputs
– external connection to electrical, water, sewage
For an additional fee, we can help you with some of the extra works including:
– project customization (59 EUR net / design hour)
– 3D photo realistic visualizations (price starts at 400 EUR)
External Walls
– Interior wall finished layer: painted
– Plasterboard 12.5 mm
– OSB board 8 mm
– Vapor barrier
– Wood frame + 8 cm PUR thermal insulation
– Container wall
Internal Walls
– Interior wall finished layer: painted / tiles
– Plasterboard 12.5 mm
– UW 75 wall-hung profile + 7 cm sound insulation, mineral wool
– Plasterboard 12.5 mm
– Interior wall finished layer: painted / tiles
Floor
– Floor finishing: PVC panels / ceramic tiles
– Waterproof plywood 2 x 12.5 mm
– Vapor barrier
– Wood frame + 10 cm XPS thermal insulation
– Galvanized steel
Roof
– Interior wall finished layer: painted
– Plasterboard 12.5 mm
– Vapor barrier
– Wood frame + 8 cm PUR thermal insulation
– Container wall
Gutters
Above the outside doors and windows we provide a small lintel that prevents water from leaking inside.
Flashings, window sills
Exterior doors
We provide high quality PVC or steel (depending on the model) doors 90x200cm. Doors are equipped with steel door handles.
Windows
We are using PVC 2-glass windows and terrace doors with perimeter fittings. Some of them are non-opening. Finished in anthracite from the inside and outside. Ug = 0,7 W/(m2K)
For an additional cost you can replace them with 3-glass PVC windows.
Interior doors
External lighting
Electrical installation
Water installation
Sewage installation
Ventilation
We are using only EU certified materials.
Heating
Our houses have a complete heating and cooling system (if the object is equipped with A/C).
Electric heaters or infrared floor heating (depending on the model).
A/C with warming function located in the living room (if the object is equipped with A/C)
We are using only EU-certified materials.
Not included in the price
Foundation
Assembly
There are a lot of dependencies so all the calculations will be prepared individually. We provide that service for free.
It requires a crane (the depends on the distance between the truck and the desired location). The whole assembly usually takes less than a day.
Before the house is transported to you and assembled, certain things must be already finished by you:
– Foundation must be ready. Dry and checked, prepared for the house-construction. We recommend either a concrete slab or a few concrete blocks placed on a compacted ground.
– Water, electrical and drainage outlets must be done and checked again with the drawings.
– Access to the plot must be provided for a truck and a crane. Min.7m free space diameter for the crane is necessary.
Transport
Payment
Payment for your house is divided into 3 stages secured by a contract:
– 50% reservation fee when signing the contract
– 30% payment after the building is built in our factory
– 20% payment after the building arrives to the Client