MOMO hercules is designed as a place for exercising in the privacy of your garden. It serves perfectly as a gym or yoga studio.
It features a simple, industrial design with large sliding doors. It’s based on a 20” container (6.1m in length). It’s a year-round facility built in accordance with current building standards. It only requires a connection to electricity and a few concrete blocks as a foundation. The object is delivered as a “turn-key” solution. It comes equipped with ventilation and an A/C.
MOMO hercules is ready for use on the same day it’s delivered. Thanks to its construction based on a marine container, it can be easily relocated from one place to another.
MOMO Hercules
15 m² container gym in turn-key standard
Building area | 15 m² |
Living area | 12 m² |
Rooms | 1 |
Floors | 1 |
DOWNLOAD THE CATALOG
+48 501 109 555
Specification
- Layout: open space
- Outside dimensions: length 6.1 m, width 2.5 m, height 2.9 m
- Internal dimensions: length 5.7 m, width 2.1 m, height 2.5 m
- Insulation: 6 cm PUR
- Windows: PVC, 2-glazed
- Heating / cooling: air-to-air heat pump
- Facade: painted
- Roof: painted
The most frequently asked question about this product
Haven’t found an answer to your question? Call us!
Included in price
- Complete and finished building to “turn-key” standard
- Interior and exterior lighting
- Complete electrical installation
- Complete ventilation system
- Internal walls: Forestia panels
- Flooring: sprung gym flooring
- Heating / cooling: air-to-air heat pump
Not included in the price
- Transport and assembly
- Foundations
- Connection to electricity
Options
- Options
- Full gym equipment and mirrors
- Wooden facade
- Additional insulation, U=0.15-18 W/m²K
- Rooftop terrace
Guaranteed buyback
We offer our Clients buyback of our shipping container houses up till 2 years from the day of delivery. To validate the value of used product we need to inspect it first and consider potential repairs and loss of value. To estimate it correctly, we provide detailed calculations to our Clients.
Payment
Payment for your building is divided into 3 stages secured by a contract:
- 50% reservation fee when signing the contract
- 40% payment after the building is built in our factory
- 10% payment after the building arrives to the Client